Call (07) 5638 5808

Servicing the Gold Coast, from Paradise Point to Coolangatta.

Call (07) 5638 5808

Concrete Cancer Repair in Gold Coast — questions and answers

Answers on concrete cancer for the Gold Coast: who pays in a body corporate, whether an owner can fix it, when an engineer is needed and what the City asks for. Each rule and dollar figure comes from a government source and carries its read date; the site sets no price for the work.

Call (07) 5638 5808

Cost

How much does concrete cancer repair cost in Gold Coast?

We publish no price, and no government source we read gives one for the repair. The costs page covers what changes a job, and the Queensland and City of Gold Coast fees and thresholds around it, each with its read date. Its Concrete cancer repair costs and rules check lists the rules that apply at your job's value, with sources.

Whose job is concrete cancer in a unit building?

Mostly the body corporate's, where the damage is in common property or the structure. The Standard Module regulation obliges it to keep common property in good condition, structurally sound to the extent that it is structural, and in a building format plan to keep foundation structures and essential supporting framework structurally sound even where they are not common property. An exclusive use by-law can shift responsibility, so read its wording.

Concrete cancer in a Gold Coast unit building

What the unit-building rules say before concrete cancer work can start

Five points in the order an owner or committee meets them, each from the Queensland Government's or the City of Gold Coast's own wording.

  1. Keeping the structure sound is the body corporate's duty

    structurally sound

    the condition the body corporate has to keep structural common property in

    A balcony slab inside a lot still counts as structure; the tiles are usually the owner's.

    Source: Body Corporate and Community Management (Standard Module) Regulation 2020 (Qld) · read

  2. Every owner gets two quotations before a vote

    2 quotations

    the minimum number of quotations each owner must receive before a general meeting votes on major spending

    When this applies depends on the limit your scheme has set for major spending.

    Source: Body Corporate and Community Management (Standard Module) Regulation 2020 (Qld) · read

  3. Design is an engineer's work

    direct supervision

    the one way someone who is not a practising professional engineer may carry out engineering services

    Judging how far the damage runs, or designing the fix, counts as that kind of service.

    Source: Professional Engineers Act 2002 (Qld) · read

  4. Scaffold over a footpath needs a City permit

    10 business days

    the notice period the City lists for a partial interference with the road reserve

    Leave that time before any scaffold or hoarding goes up.

    Source: City of Gold Coast, Temporary road closures · read

  5. The City may hold the original drawings

    A$282.00

    the City's fee for a copy of the original structure plans, part of which is refundable

    A body corporate applies through an authorised officer, with a letter of authority.

    Source: City of Gold Coast, Register of Fees and Charges 2026-27 · read

Each figure names its source and the date it was read. None is a quote for your job or a promise about any application.

Concrete cancer repair Gold Coast: see this infographic as an image to save or share
Concrete cancer repair Gold Coast infographic: What the unit-building rules say before concrete cancer work can start, 5 points, each with its source — Concrete Cancer Repair, Gold Coast.
Concrete cancer repair Gold Coast: What the unit-building rules say before concrete cancer work can start. Every figure in it is sourced in the panel above.

Process

Can I fix it myself?

Not the structural part in a unit building: the body corporate maintains that. Beyond it, QBCC says building work valued over A$3,300 needs a QBCC-licensed contractor, and an engineering assessment or design needs a practising registered professional engineer or one supervising directly.

Is it concrete cancer or only a crack?

Look for rust. Concrete cancer is the steel inside the concrete rusting; the rust takes up more room than the steel, forces cracks open and pushes the concrete off. Cracks alone do not make a building structurally unsound, so have it inspected rather than judged from a photo.

Timing

How quickly can someone get to me?

We cannot promise a time. It depends on the provider's bookings. Form and phone enquiries are passed to a local provider, who contacts you directly.

Is an engineer needed?

If the repair needs an engineering assessment or design, yes: in Queensland that is a professional engineering service, which a practising professional engineer must carry out or directly supervise.

Permits and approvals

Does the repair need council approval?

Possibly. The City of Gold Coast counts repairs among works that may need building approval, while minor repairs that do not touch a building's structural or fire safety may not. For a structural repair, a private building certifier is the person to ask. Scaffold or hoarding over a footpath needs its own City permit under Local Law 11.

Source: City of Gold Coast, Do your building works need approval?; City of Gold Coast, Temporary road closures; read 27 September 2026 and re-matched 1 October 2026.

Service area

Which suburbs do you cover?

The Gold Coast from Paradise Point to Coolangatta. Surfers Paradise and Broadbeach have a page each, written around a City permit that changes how a repair is reached; Main Beach, Southport, Burleigh Heads, Currumbin and the rest are covered on the same terms.

Do you do the repairs yourselves?

No. A marketing company runs this site and passes each enquiry to an independent licensed local provider. The provider inspects, quotes and does any work; we hold no licence and have no crews or plant.

Call (07) 5638 5808

Request a free quote

Last reviewed · Updated · First published